Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents

...

Ports Validate by Port Type + Port Code + Country Code

Summary:
Ports Validate by Port Type + Port Code + Country Code

...

  • Port validation changed to include the country code as well. So, we can now have a Port with the same code and type in different countries

...

PO Line Item Shipping Details → Shipment Ref hyperlink

Summary:
PO Line Item Shipping Details → Shipment Ref link

...

  • Added a Shipment Ref hyperlink to the PO Line Shipping Details

...

Pending QC Report Changes

Summary:
Pending QC Report Changes

Ticket:

Jira Legacy
serverSystem JIRA
serverIdb157ffa3-650f-3eac-ac6a-49d6a4f1db87
keyDCM-2383

Detail:

  • Added a new date filter for the ‘PO Handover Date Planned’ (from and to)

  • This date should default to 1 month back and 2 months forward on load and clear

  • This date is not required in the filter so dates can be removed before searching

...

PO QC List Code Maintenance

Summary:
PO QC List Code Maintenance

Ticket:

Jira Legacy
serverSystem JIRA
serverIdb157ffa3-650f-3eac-ac6a-49d6a4f1db87
keyDCM-2363

Detail:

  • PO QC List code movement into specific PO QC files

...